|
Snapshot of the Word file:"Common ION-F Hardware: Who’s Responsible & Delivery Dates_REVISION 02.06.26—Common ION-F Hardware: Who’s Responsible & Delivery DatesPoint".doc REVISION 02.06.26—Common ION-F Hardware: Who’s Responsible & Delivery Dates USU need feedback from UW & VT Conformal, by USU With board USU (both halves of top) With board Each school provides own Telemetry Board Jeff Henry USU 7/15 Conformal, by USU With board USU (both halves of top) With board Each school provides own Camera Board Aroh B. USU 7/31 Conformal, by USU With board USU (both halves of top) With board USU provides parts (minimum) IO Board Aroh B./ James Cook USU Completed6/30 Conformal, by USU With board USU (both halves of top With board Each school provides own Need backplane to test with Science Board Fish USU 7/31 Conformal, by USU With board USU (both halves of top) With board See science patch antennas Backplane Fish USU 10/2 USU (all backplane to board) With backplane and/or boards Science patches Chad F. Joel Q. USU 7/12 Nickel plated Completed USU 7/12 Cable length U/L Rx Joel Q. USU Keep until board is ready Iridite, by USU With hardware USU (to CEE) With hardware USU (to CEE) D/L Patch James Gutshall USU ? USU(to D/L Tx) ? Cable length PPTs, PPU Campbell UW Need vac chamber to do final acceptance testing. Kapton, by UWIridite, by UW With hardware UW (PPTs to PPU, PPU to CEE) With hardware UW (PPTs to PPU, PPU to CEE) With hardware GPS/Xlink Campbell / APL / Schwartz APL soon??? VT VT 1WB CLOSED VT delivered? Each school provides own X/L Monopole CLOSED VT delivered? Iridite, by VT With hardware VT With hardware VT With hardware Ground plane dimensions, antenna location, wire lengths Lightband and intersatellite connectors CLOSED At UW Completed PSC Completed At UW With hardware Each school provides own PSC retrofit late October SSS Connectors CLOSED At AFRL(for VT) Email sent to Kumashiro 7/25 Fastener Order 1 CLOSED At UW USU: ?VT: delivered Honeycomb CLOSED At UW USU: ?VT: delivered Cut to fit Solar panel layup Performed at SDL CLOSED Each school provides own USU (to inside of satellite) With panels CEE Gillett UW CLOSED Iridite, by UW With hardware Connector locations in cells 8/1 Gyro board CLOSED UW 10/7 Conformal, by UW With board See rate gyros USU Motor Board USU 9/10 Conformal, by USU With board USU (both halves of top) With board USU Power Board 1 Not Common HardwareUSU Conformal, by USU With board USU (both halves of top) With board USU Power Board 2 USU Conformal, by USU With board USU (both halves of top) With board USU Power Board 3 USU Conformal, by USU With board USU (both halves of top) With board UW Power Board UW Conformal, by UW With board UW (both halves of top) With board UW / VT Relay Board CLOSED UW 10/15 Conformal, by UW With board UW (both halves of top) With board VT Torque Coil Board Schwartz / Pressl VT design, USU fab Conformal, by USU With board With board VT Power Board Schwartz / Zhan VT design, USU fab Conformal, by USU With board With board UW/VT Magnetometer board Findlay UW DELIVERED Each school does own Meller will verify Rate gyros and mount Meller UW DELIVERED Each school does own Meller will verify D/L Tx At each school Delivered Electroless nickel, by L3 Completed Each school Each school (to CEE) GPS Patch Each school provides own Each school provides own Each school provides own CEE Thermal Redesign CLOSED Up to school 10/5 Irridite Up to school...For more information, Please download the word document. Word file "REVISION 02.06.26—Common ION-F Hardware: Who’s Responsible & Delivery DatesPoint" Free Download Address Click here to download the word document:Common ION-F Hardware: Who’s Responsible & Delivery Dates.doc |